In food production, the floor is part of your hygiene system. It needs to be seamless, cleanable, slip-resistant and able to take whatever your process and cleaning regime throw at it.

Food and drink sites put flooring under more pressure than almost any other environment: hot water and steam, fats, sugars and acids, temperature swings between processing and chilled areas, heavy wheeled traffic, and daily cleaning with strong chemicals. On top of that, the floor has to support your food safety management and pass audit.

Hull, Grimsby and the wider Humber and Lincolnshire area is home to a large food processing sector, from seafood to bakery and ready meals. We understand the operational realities — short shutdown windows, phased work and the need to hand areas back clean and on time.

What a hygienic floor needs

  • A seamless surface with no joints, cracks or gaps where bacteria can harbour.
  • Integral resin coving to create a radius between floor and wall, so there is no hard corner to clean.
  • Correct falls to drains, so water does not pond.
  • Proper detailing around drains, gullies, plinths, columns and door thresholds.
  • Suitable slip resistance for wet and greasy conditions, balanced against cleanability.
  • Resistance to thermal shock and chemicals from your process and cleaning regime.

Typical system choices

PU screed is the usual choice for wet and hot process areas, with a textured finish for slip resistance and integral coving at the walls. Dry goods, packing and ambient storage areas can often use a lighter epoxy or polyurethane system. We will zone your site and specify each area on its merits rather than over- or under-specifying the whole floor.

Some products are marketed with antimicrobial additives. These can be a useful extra, but they are not a substitute for a seamless, correctly detailed floor and a good cleaning regime.

Working in live food environments

  • Planned around shutdowns, weekends and phased handovers
  • Low-odour and fast-cure systems available where appropriate
  • Dust-controlled preparation with extraction
  • Clean, segregated working areas and tidy handover

Frequently asked questions

Can you install flooring during a short shutdown?

Yes, with good planning. Fast-cure PU screeds can return to service quickly, and larger sites can be phased. Talk to us early so materials and labour are programmed around your shutdown.

Do you install drainage?

Our work centres on the floor and its detailing around drains, gullies and channels. Where new drainage is needed, we can coordinate with your drainage contractor so the floor and drains work together.

What about odour near food?

Some resin systems have a noticeable odour during application. Low-odour products are available and we will discuss ventilation and segregation to protect your products and staff.

Our process

It’s all in the prep.

Most resin floor failures start beneath the surface: weak laitance, contamination, moisture or poorly detailed edges. That is why preparation is not a stage we rush. It is the job.

  1. 01

    Survey

    We look at the floor, the building and how the area is used: traffic, chemicals, temperatures, cleaning and programme.

  2. 02

    Test

    We assess the concrete — moisture, soundness, contamination, cracks and joints — before anything is specified.

  3. 03

    Specify

    We recommend a system and build-up for each area, with clear information on curing times and downtime.

  4. 04

    Prepare

    Mechanical preparation with dust extraction: diamond grinding, shot blasting, repairs and detailing.

  5. 05

    Install

    Priming and installation in controlled conditions, with attention to edges, drains, joints and coving.

  6. 06

    Hand over

    A clean handover with guidance on curing, cleaning and looking after your new floor.